Single Supplier Product Frameworks

Aids & Adaptation Equipment Members can access to 31/3/27
Air Source Heat Pumps 01/01/23 – 31/12/26
Bathroom Suites Members can access to 30/09/27
Extract Fans 01/04/24 – 31/03/28
GRP Doors supply and Supply & Install 01/04/24 -31/03/28
Heating Valves Members can access to 30/09/27
Kitchen Units 01/01/23 – 31/12/27
Positive Input Ventilation 1/4/24 – 31/03/28
PVCu Windows Members can access until 31/07/27
Radiators Members can access to 30/09/27
Slip Resistant and Safety Flooring Members can access to 30/09/27
Taps Members can access to 30/09/27
GRP Fire Doors Supply Only 01/04/24 – 31/03/28
GRP Fire Doors Supply & Install 01/04/24/ – 31/03/28

Multi-Supplier Frameworks

FRAMEWORK

START

END

SUPPLIERS

Asbestos Surveys Expired Currently Being Retendered.
TBC
Asbestos Removal Expired Currently Being Retendered.
TBC
Fire Risk Assessments Currently Being Retendered.
TBC
Fire Prevention & Protection (4 Lots) Currently Being Retendered.
TBC
Passive Fire Stopping & Associated Works Bell Decorating Group MD Group
01/07/2022 30/06/2027 CLC Contractors Passive Fire Safety Solutions
DR Jones Yeovil Ventro
Harmony Fire
Electrical Testing & Inspection BPM Contracting Services Liberty Group
01/06/2022 31/05/2027 Dodd Group (South) MD Building Services Ltd
Jeff Way Electrical Services Ltd Moreheat Limited
Legal Services

  • Lot 1 – Development
  • Lot 2 – Governance & Treasury
  • Lot 3 – General Property
  • Lot 4 – Corporate Services
Ashfords (1) Foot Anstey (1 & 3)
13/07/2022 12/07/2028 Bevan Brittan (1 & 2) Pennington Manches Cooper (1,2 & 3)
Capsticks (1,2,3 & 4) Devonshires (2,3 & 4) Trowers & Hamlins (1 & 2) Stephens Scown (1)
Radon Services Eurofins Radon Testing Healthy Indoor Environments
01/06/2022 31/05/2027 Glencoe Radon Gas Centre Mouldex Ltd
GM Scientific Ltd (Radonova Labs) MSS Environmental Ltd

Dynamic Purchasing Systems

To apply for a place on a DPS please visit www.advantageswtenders.co.uk

DPS Validity Period
Windows Cleaning and Guttering 01/03/2017 – 28/02/2027
Cleaning 01/04/2017 – 31/03/2027
Grounds Maintenance 01/03/2017 – 28/02/2027
Scaffolding 01/08/2020 – 31/03/2030
Roofing replacement and repair 01/11/2020 – 31/10/2030
Energy efficiency and decarbonisation 01/10/2022 – 30/09/2032
Insurance 01/12/2017 – 30/11/2027
Waste 01/01/2018 – 31/12/2027